For full functionality of this site it is necessary to enable JavaScript.
EMIN.VN
0

ANNOUNCEMENT OF 2025 HOLIDAY SCHEDULE

21/01/y 14:18:08

EMIN Vietnam Joint Stock Company respectfully announces to our customers and partners the New Year holiday schedule for 2025.

[ANNOUNCEMENT OF 2025 Lunar New Year Holiday Schedule]

Joining the joyful atmosphere of the last days of the year, EMIN GROUP would like to announce to all customers and partners the 2025 Lunar New Year holiday schedule as follows:

- Time off: Saturday, January 25, 2025 (December 26 of the lunar calendar)

-Return to work time: Monday, February 3, 2025 (January 6 of the lunar calendar)

In case of need, you can directly contact the following Hotline numbers for support:

☎️ City. Hanoi: (024) 35 381 269

☎️ City. Hai Phong: 0987 222 477 

☎️ City. Da Nang: 0906 492 829

☎️ City. Bac Ninh: 0936 415 843

☎️ City. Dong Nai: 0345689 536

☎️ City. HCM: (028) 38 119 636

EMIN GROUP Wishes our customers, partners and all employees a new year: AN KHANG, PROSPERITY - EVERYTHING AS YOU WANT!

ຂ່າວທີ່ກ່ຽວຂ້ອງ

INVITATION: KEYSIGHT BOOTH AT INTELLIGENT ASIA HANOI 2026
26/06/y 11:50:23

Intelligent Asia Hanoi 2026 will take place at the National Exhibition Center (VEC) in Dong Anh from July 1 to 4, 2026. Although a newcomer to the specialized exhibition circuit, the event has already established its standing by bringing together hundreds of leading enterprises from the electronics and smart manufacturing sectors. It serves as a vital bridge, enabling manufacturers to meet, negotiate, and access the latest technological solutions

Realizing a High-Performance RF System: The Combination of MATLAB and Tabor Proteus
26/06/y 10:32:59

Bridging the gap between theoretical simulation and actual hardware implementation remains the greatest challenge in advanced engineering projects. In fields such as radar, 5G/6G, and quantum computing, a lack of synchronization between the design environment and operational hardware often prolongs development timelines

Downtime Doesn't Strike Suddenly: Many Factories Lose Hundreds of Hours of Production by Overlooking Subtle Warning Signs
25/06/y 14:15:17

For many factories, downtime is often viewed as an unexpected event that strikes during a production shift. In reality, however, the situation is different. Before a motor fails, a variable frequency drive (VFD) reports an error, or a production line requires an emergency stop, the equipment typically emits multiple warning signals—such as abnormal temperature rises, excessive vibration, degraded power quality, or unstable communication performance. These indicators can persist for days or even months before an actual breakdown occurs

Micsig MOIP Series: Comprehensive testing solution for high-power three-phase inverters
22/06/y 11:36:21

The widespread adoption of wideband semiconductor components such as SiC and GaN in photovoltaic inverters, motor drives, and automotive charging systems has driven the switching frequency and power density of three-phase inverters to unprecedented levels. However, this development has also brought with it severe measurement challenges: high voltages, intense electromagnetic interference, and the requirement for ultra-fast switching signal capture at the nanosecond scale

ຕິດຕາມຂ່າວສານ ແລະ ຂໍ້ສະເໜີ

ຮັບສ່ວນຫຼຸດພິເສດຕາມປະລິມານ, ອັບເດດລາຄາຂາຍສົ່ງ ແລະ ການແຈ້ງເຕືອນສິນຄ້າໃໝ່ສົ່ງກົງເຖິງອິນບັອກຂອງທ່ານ.

ໂດຍການສະໝັກສະມາຊິກ, ທ່ານຍອມຮັບ ເງື່ອນໄຂການໃຫ້ບໍລິການ ແລະ ນະໂຍບາຍຄວາມເປັນສ່ວນຕົວ ຂອງພວກເຮົາ.

ການຊ່ວຍເຫຼືໍາດ່ວນ

ເຂົ້າເຖິງຜູ້ຊ່ຽວຊານທີ່ໄດ້ຮັບການຢັ້ງຢືນຂອງພວກເຮົາໂດຍກົງ