
A 3x current-sizing approach can provide margin for appliance startup inrush, capacitor-charging peaks, and compressor starting transients that a nameplate-current source may not sustain.

A 3x current-sizing approach can provide margin for appliance startup inrush, capacitor-charging peaks, and compressor starting transients that a nameplate-current source may not sustain.

In automated test equipment (ATE) systems, burn-in screening chambers, and microchip research laboratories, high temperature is consistently one of the greatest “enemies,” causing measurement errors and reducing hardware lifespan

Tektronix’s MSO Series oscilloscopes, Keithley SMUs, and automation solutions help semiconductor engineers uncover hidden faults, accelerate compliance testing, and test SiC/GaN power devices

Vietnam needs to choose the right development model and invest in advanced equipment to close the technology gap with international experts.


EMIN and ViTrox to Showcase Smart Manufacturing Innovations at VIMF Bac Ninh 2026

As we enter the 2026–2030 period, wide-bandgap (WBG) semiconductor materials such as Silicon Carbide (SiC) and Gallium Nitride (GaN) are transforming the power electronics, electric vehicle (EV/HEV), renewable energy, and AI data center industries. The shift from traditional silicon to SiC and GaN enables higher power density, smaller passive components, and improved overall system energy efficiency.

The increasing density of AI accelerators, high-bandwidth memory, and high-speed interconnects is placing more stringent demands on chip design. Beyond processing capability, chips must maintain signal integrity, operate reliably under heavy loads, and minimize power consumption. Combining high-speed signal measurements, electrical characterization, and power analysis helps engineers identify design limitations early, before hardware is deployed.

The string of solar panels has been isolated, and the technician has completed the Lockout/Tagout (LOTO) procedure; he now stands before a combiner box, clamp meter in hand. A few hundred meters away, a bolt of lightning strikes an open patch of ground—missing the solar panels entirely. Yet, through the very conductor he is currently testing, a voltage surge of several thousand volts has just flashed by in less than a millisecond

In a solar power plant, the most dangerous moment is not when the system is operating at full capacity. Rather, it occurs just before a technician disconnects a connector, replaces a fuse, or opens an inverter cabinet even after the solar string has been isolated
ຮັບສ່ວນຫຼຸດພິເສດຕາມປະລິມານ, ອັບເດດລາຄາຂາຍສົ່ງ ແລະ ການແຈ້ງເຕືອນສິນຄ້າໃໝ່ສົ່ງກົງເຖິງອິນບັອກຂອງທ່ານ.
ໂດຍການສະໝັກສະມາຊິກ, ທ່ານຍອມຮັບ ເງື່ອນໄຂການໃຫ້ບໍລິການ ແລະ ນະໂຍບາຍຄວາມເປັນສ່ວນຕົວ ຂອງພວກເຮົາ.
ເຂົ້າເຖິງຜູ້ຊ່ຽວຊານທີ່ໄດ້ຮັບການຢັ້ງຢືນຂອງພວກເຮົາໂດຍກົງ