For full functionality of this site it is necessary to enable JavaScript.
EMIN.VN
0
Product image

Bangpu LP Long axial vertical drainage pump (15-3000m3/h)

联系我们
安全结算
品质保证
轻松更换与退货
支持配送

Capacity: 15–3000 m³/h

Head: 6–60 m

Medium temperature: 0 ℃ – 60 ℃

Maximum pressure: ≤16 bar

LP long-axis vertical drainage pump adopts a vertical structure, and the long-axis design makes it perform well when dealing with drainage of deep wells or large water bodies. The pump body is sturdy and durable and can operate stably for a long time, effectively ensuring the smooth progress of drainage work. LP long-axis vertical drainage pump adopts multiple protection measures, including overload protection, overheating protection, etc., to ensure the safety and reliability of the equipment during operation. At the same time, the pump also has high corrosion resistance, is suitable for a variety of harsh environments, and extends its service life.


Install:

Preparation before installation

1. When choosing an installation location, pay attention to the fact that it needs to be in a ventilated and dry room, preferably close to the drainage outlet;

2. Check whether the pump body, motor and all accessories are intact.


installation steps

1. Install the flow-passing parts of the vertical long-axis pump section by section from bottom to top according to the example of the structure diagram, ensuring that the connections between the components are tight and correct.

2. Add a pair of wedge pads between the bottom of the outlet elbow and the foundation to ensure that the pump body is stable.

3. Use concrete to pour the anchor bolts. After the concrete is dry, check the levelness of the flange plane on the top of the motor support to ensure that the anchor bolts are not loose.

4. Configure cooling water pipes as needed (if the water pump is not shown in the structure diagram, a cooling water pipe needs to be installed).

5. Adjust the adjusting nut on the upper part of the thrust bearing or the pump coupling to lift the rotor. The lifting amount is 1/2 of the total deflection of the rotor.

6. Adjust the jackscrew on the motor base to adjust the center of the motor coupling to ensure coaxiality between the motor and the pump body.

7. Check the coupling runout

8. Wiring and electrical installation

9. Inspection and Debugging

获取优惠更新

获取专属批量折扣、批发价格更新和新产品通知,直接发送到您的邮箱。

订阅即表示您同意我们的服务条款隐私政策

快速支持

直接联系认证专家