快速支持
直接联系认证专家
Width: 5.08 mm
Height: 5.08 mm
Tolerance: 5 %
Case Style: Conformally Coated
Dielectric: C0G (NP0)
Capacitance: 820 pF
Lead Spacing: 5.08 mm
Lead Diameter: 0.508 mm
Voltage Rating: 50 VDC
Capacitance - nF: 0.82 nF
Termination Style: Radial
Voltage Rating DC: 50 VDC
Operating Temperature Range: - 55 C to + 125 C
Maximum Operating Temperature: + 125 C
Minimum Operating Temperature: - 55 C
Temperature Coefficient / Code: C0G (NP0)