For full functionality of this site it is necessary to enable JavaScript.
EMIN.VN
0

Electronic Load Prodigit 3270 series with Turbo mode

2020年12月25日 16時08分49秒

\- 4 digit V/A/W Meter, display the Voltage (Vrms, Vpeak, Vmax., Vmin), Current (Irms, Ipeak, Imax., Imin.), Watt, Voltampere (VA), Frequency, Crest



- 4 digit V/A/W Meter, display the Voltage (Vrms, Vpeak, Vmax., Vmin), Current (Irms, Ipeak, Imax., Imin.), Watt, Voltampere (VA), Frequency, Crest Factor, Power Factor, Total Harmonic Distortion of Voltage (VTHD), Voltage Harmonic (VH), Total Harmonic Distortion of Current (ITHD), Current Harmonic (IH).

- CC, Linear CC, CR, CV, CP and AC Rectifier Load mode.

- Voltage Optional: 425Vrms / 600Vdc (except 3273/3274).

- Crest factor range: 1.414~5.0

- Power factor (PF) range: 0~1 lead or (-1~0) lag.

- Built-in function test modes include UPS Efficiency, PV Inverter Efficiency, UPS Back-up time, Battery Discharge time, UPS transfer time, Fuse/Breaker Trip/Non-Trip, Short circuit, OCP, OPP test modes.

- Turbo mode is able to increase to 2 times the current and power of electronic load in a short period which is the most suitable for Fuse / Breaker test and short circuit, OCP, OPP test of AC power supply.

- Time measurement can be applied to batteries, UPS, fuses and circuit breakers and other tests.

- Eight units parallel up to 90KW and three-phase △ or Y load connection can be synchronized control by one master unit.

- Support on-load boot: at first set Load ON to support on-load boot, inverter or uninterruptible power supply is turned on directly with the set load current, used to verify whether the starter is stable when the Inverter is connected.

- Supports the loading and unloading angle control; the loading and unloading angle control, the full range of 0-359 degrees can be set to verify whether the Inverter output voltage transient response is stable when the actual electrical plugging and unplugging, and whether Overshoot / Undershoot is within the allowable range.

- Support positive half-cycle or negative half-cycle loading; used to verify whether the Inverter output voltage remains stable when the actual appliance has only positive half-cycle or negative half-cycle load current.

- Supports SCR/TRIAC current phase modulation waveforms, 90 degree Trailing edge and Leading Edge.

- Frequency Range: DC, 40~440Hz.

- Voltage and current monitoring.

- Can be controlled by external voltage for CC, Linear CC, CR, CV, CP operating modes.

- Protection against V, I, W, and ℃.

- Optional interface: GPIB, RS232, USB, LAN.

- The most complete measurement capabilities

3270 Series AC & DC electronic load built-in 16-bit A/D and DSP precision measurement circuit, provides accurate measurements, measurement items have Vrms, Arms, Watt, VA, CF, PF, THD, VTHD, ITHD, Ipeak, Amax, Amin, Vmax, and Vmin.

In addition to these measurement functions, it also provides time measurement, products such as UPS, fuses and circuit breakers etc. trip or blow time and transfer time for Off-line UPS.

Power Curve


Complete AC&DC load modes


AC load mode 


CC Mode: In the constant current mode of AC Load, can be applied to sine wave voltage source, providing CE PF test of linear load.


Linear Constant Current Mode: Can be applied to sine wave and non-sine wave voltage source, as shown in the PWM inverter driver, step voltage source, and off-line UPS sine wave switch to square wave, square wave switch to sine wave.


Supported on-load start-up: at first set Load ON to support on-load start-up, inverter or uninterruptible power supply is start-up directly with the set load current, used to verify whether the Inverter is stable when the load is connected during start-up.


Supports the loading and unloading current angle control the loading and unloading current angle range of 0-359 degrees can be programmed to verify whether the Inverter output voltage transient response is stable during the actual electrical appliance is connected or turn ON / OFF randomly it can be used to verify the Overshoot / Undershoot response is within the desired range.


Support positive half-cycle or negative half-cycle loading: it can be used to verify whether the Inverter output voltage remains stable when the actual appliance has only positive half-cycle or negative half-cycle load current.


Support the Inrush Current of the inverter at startup and Power Plug-in test when the power supply is turned on to verify the Inrush Current and the sudden connection of the appliance when the power is turned on (Surge Current), to verify if whether the Inverter Output voltage transient response is stable, as shown in the figure below.


AC rectified load simulation meet the IEC62040-3 and IEC61683 test specifications

(IEC62040-3 ups Efficiency Measurement non-Linear and IEC61683 Resistive Plus Non-Linear)

3270 AC & DC electronic load AC rectified load mode is fully compliant with the IEC test specification requirements for the ups. IEC 62040-3 ups Efficiency Measurement Non-Linear and IEC 61683 Resistive Plus Non-Linear, respectively, 3270 AC rectifier load mode uses CC + CR load mode and maintain current THD at 80%, to simulate the actual PV Inverter connected to the electronic device.


3270 Load Various Test Modes

The 3270 Series AC & DC electronic load features built-in test modes for a variety of products. Including AC Load of UPS, Inverter, Fuse/Breaker, AC Power Source and DC Load of Battery, Fuse/Breaker, DC Power Source etc.. as shown below.


Current protection component test

Current protection component includes Fuse, Circuit breakers and a new PTC Resettable fuse etc..., its function is when the circuit current exceeds the design of the rated value, that is, if the load exceeds the design of the current capacity, the circuit will be disconnected, in order to avoid overheating, even fire. Fuse is a one-time use of the protection components, Breaker and PTC can be reused.

The current protection components of the protection current value and the protection reaction time has usually a product of the relationship that is, the greater the current through the current protection component, the shorter the reaction time to protect the circuit. This is similar to energy protection components.

Due to this feature, the 3270 series AC & DC electronic load, in particular for the verification of current protection components, has developed a Fuse Test function to test and verify such protection element with an electronic load of rated current and power. When Turbo mode is set to ON, the test current can be up to double the maximum current within 1 second of test period. Take 3270 as an example, the maximum test current can be doubled to 75A. That is, when the Turbo mode of the 3270 series is ON, the test current value can reach to 2 units 3270 series (normal mode) within 1 second test period.


3270_applications_e06.jpg


Basically, Fuse test has Trip (Blown) and Non-Trip (no Blown) 2 types:

Fuse Test setting parameters include test current (Istart), test time (Tme), test REPEAT Time etc.. 

In the Trip fuse test, it is used to test when there is too large abnormal current the Fuse or Bleaker must be able to provide the protection of the circuit breaker, that means current protection components need the fuse action, therefore the test current needs to be larger than the fuse current rating.

When the 3270 Series AC & DC electronic load detects a voltage lower than 1.0V, the LCD displays the number of Repeat Cycle and Current Protection Fusing Time XXXX_X sec.
In the Non-Trip (no Blown) test, the current protection component is required to achieve non-blow action, so the test current needs to be lower than the fuse current rating that is used to verify the fuse must not blow during normal current range. When the 3270 series AC & DC electronic load is not blown after the test time (Pulse Time) and the repeated Repeat number, the LCD displays the information of the Repeat number.


Battery test function

3270 series AC & DC electronic load has built-in new TYPE1 - TYPE3 battery discharge test, you can select the desired battery test mode, the test results can be directly displayed on the LCD display for battery AH capacity, the voltage value after discharge and the cumulative discharge time.


Parallel and three-phase control

The 3270 Series AC & DC load provides multiple units in parallel, three-phase applications that allow users to test applications with greater power or three-phase AC power, this is more flexibility to use the 3270 Series AC & DC Electronic Load for control. In parallel / three-phase operation, the user operates the unit as the operation of a single machine, as long as the Master can be operated, Slave1 and Slave2 will automatically sink the load and measurement Parallel and three-phase connection as shown below.


Panel instruction


Voltage optional: 425Vrms/600Vdc (except 3273/3274)

 3270_specifications_e02.jpg


関連ニュース

DC, Pulsed DC, or RF: Selecting a Plasma Source Based on Material and Process
2026年11月23日 16時55分48秒

In sputtering, positive ions (typically Argon) are accelerated toward a target to bombard and dislodge material. A stable ion current can only be maintained if electric charge does not accumulate on the target surface. The simulation below illustrates this principle qualitatively: the blue trace follows the waveform, while the amber-colored bar represents the level of charge accumulated on the target surface

Errors in Measuring Rebar Diameter within Concrete
2026年11月23日 13時50分41秒

In the quality assessment of reinforced concrete structures using non-destructive testing (NDT) methods, determining the diameter (d) of reinforcing bars directly on a completed structural element often results in significantly greater margins of error compared to measuring the thickness of the concrete cover. If the identified diameter deviates by one or two standard size increments (for example, if a D16 bar is misidentified as a D20 or D12), the entire analysis—including the calculation of load-bearing capacity and the verification of the structural design—loses its reliability.

Assessment and Retrofitting of Reinforced Concrete Structures After Fire Exposure in Accordance with TCVN 14104:2025
2026年11月23日 11時48分42秒

In accordance with the principles for the preservation and post-fire structural assessment stipulated in TCVN 14104:2025, the inspection entity must accurately quantify the extent of cross-sectional degradation in heat-exposed concrete, the presence of subsurface delamination, and the condition of the internal steel reinforcement before developing a strengthening plan.

Hướng dẫn đo nghiệm thu chiều dày lớp bê tông bảo vệ đúng chuẩn TCVN 9356:2012 & Luật Xây dựng 2025
2026年11月21日 10時00分27秒

Để kết quả đo đạt độ tin cậy pháp lý khi làm hồ sơ hoàn công và nghiệm thu với tư vấn giám sát, kỹ sư hiện trường và thí nghiệm viên phòng LAS-XD cần làm chủ quy trình vận hành máy đo chiều dày lớp bê tông bảo vệ, kiểm soát các yếu tố gây nhiễu từ trường và xử lý số liệu đúng quy chuẩn.

お得な情報を受け取る

数量割引、まとめ買い価格の更新、新製品情報をメールでお届けします。

登録することで、当社の利用規約およびプライバシーポリシーに同意したものとみなされます。

クイックサポート

認定専門家へ直接アクセス