Reliability Test for Relay Using GW PSW Power Supply and PEL-3111 E. Load

2017年12月19日 17時28分24秒

How do you conduct relay connection point (N.O. / N.C.) tests? How do you test the life cycle of relay’s connection point (N.O. / N.C.)?   How do you evalua

How do you conduct relay connection point (N.O. / N.C.) tests? How do you test the life cycle of relay’s connection
point (N.O. / N.C.)?   How do you evaluate the connection resistance of connection point (N.O. / N.C.) after multiple
tests? How do you evaluate the speed for operating connection point (N.O. / N.C.)? 

Relay, functioning to produce mechanical on-off movement by receiving electric signal to change electro magnet,
is often applied to control other electronic device via receiving electronic signal. Voltage exerted on relay’s coil
allows current to pass through coil and magnetizes core. Armature is then be pulled by core due to electromagnetic
force. Hence, a mechanical on-off movement is produced.  


As shown on the top diagram, PSW 30-108, Relay and PEL-3111 are connected by series. PEL-3111 is set to 80A
current sink. Each time, Relay’s NO-COM is closed, NO-COM is tested for its current reliability. In the meantime,
PSW 80-40.5 is utilized to output sequential power supply to produce control signal to control Relay’s NO-COM.

One GW Instek PSW 80-40.5 can meet the actual measurement requirements via planning Relay’s control signal.
It not only controls signal’s voltage, current, time and period, but also determines the number of operating cycle.
There are totally 20,000 steps and each step can be set from 50ms to 20 days. The number of cycle can reach
1 billion or infinite by different specifications. Relay’s control signal can only verify the mechanical characteristics
of NO-COM and NC-COM. For further electric characteristic verification of NO-COM and NC-COM, PSW 30-108
and PEL-3111 must be concurrently utilized to produce C.C. output. Based upon Relay’s specifications, the combined
application of two instruments can conduct fast current switching test and provide large current verification,
including current withstanding value and current withstanding time so as to ensure Relay’s quality. 

GW instek PEL-3111 Programmable DC Electronic Load (150V, 210A, 1050W)

関連ニュース

Identifying the causes of short-term power outages using a power analyzer.
2026年08月07日 10時28分40秒

A power quality analyzer can record the entire sequence of events—before, during, and after—a momentary power outage. Based on the captured voltage, current, and waveform data, engineers can pinpoint whether the fault originated from the utility grid or the facility's own electrical system, rather than relying on speculation based solely on external symptoms

Fire Alarm Response Procedure for Office Buildings
2026年08月06日 15時51分06秒

When the fire alarm system is activated, the first priority is to assign a designated person to identify the source of the alarm and respond to the incident without delay. According to standard fire safety procedures, a trained emergency response team should immediately proceed to the affected area, assess the level of risk, and coordinate other personnel to follow the established fire emergency procedures.

Need a simple fix for weak or unstable voltage? Try a DHVN unit today.
2026年08月06日 14時06分28秒

You can easily check for weak or unstable power right at home using a multimeter. After just a few minutes of measuring the voltage, you will be able to determine whether the power supply is experiencing a voltage drop or if the issue lies with the wiring, the outlet, or the appliance itself.

6 early signs of a burnt start capacitor to avoid losing millions
2026年08月06日 10時34分44秒

"Silent capacitor burnout" refers to a phenomenon where a start capacitor gradually loses capacitance without exploding or emitting smoke, making it difficult for the user to detect the issue until the motor has sustained severe damage. The appliance continues to operate but runs sluggishly, overheats, and consumes twice the normal amount of electricity. Without periodic inspections, a component costing only a few tens of thousands of dong could force you to replace the entire motor, air conditioner compressor, or ceiling fan an expense running into the millions.

お得な情報を受け取る

数量割引、まとめ買い価格の更新、新製品情報をメールでお届けします。

登録することで、当社の利用規約およびプライバシーポリシーに同意したものとみなされます。

クイックサポート

認定専門家へ直接アクセス