For full functionality of this site it is necessary to enable JavaScript.
EMIN.VN
0

5 things to know when setting up a production line at the beginning of the year.

2026년 02월 24일 11시 07분 43초

After the Lunar New Year holiday, many factories typically spend a short period testing their production lines before resuming stable production.

Prolonged machine downtime can alter the operating state of the equipment, from power supply and temperature conditions to signal controllers. When the machine is restarted, small errors can easily appear during the load increase phase.

Checking the accuracy of the control center from the very first shifts helps limit the failure rate in the production chain and reduces the risk of unplanned machine downtime.

Check the quality of the power supply before increasing production load

The electrical load in the area often changes after long holidays, leading to voltage fluctuations or the appearance of harmonics during certain operating hours. These fluctuations can directly affect inverters, PLCs, and automatic control systems when the production line starts running continuously.

Recording power quality data during commissioning helps identify power supply anomalies early. Models like the Chauvin Arnoux CA8336 allow monitoring of voltage, load current, harmonics, and voltage drops over actual operating cycles. Data collected in the first few hours is usually sufficient to assess stability before the line reaches its design capacity.

Control signal errors are more likely to occur after a period of machine downtime

Optical sensors, encoders, and analog signals in the 4 to 20 mA range can vary slightly due to environmental influences or mechanical conditions. Small deviations can still lead to recurring errors if the production line operates continuously for extended periods.

Direct observation of the signal waveform helps confirm that the amplitude and frequency are within operating limits. The Tektronix TBS2000B or Keysight DSOX1204G are popular models for quick signal testing in control cabinets and automated machinery.

Operating temperature changes when the production line resumes operation

Dust and moisture buildup during downtime can alter electrical contact and heat dissipation. As load current increases with production, some connection points begin to generate localized heat.

Thermal cameras help quickly identify areas of abnormal temperature on electrical cabinets, busbars, or motor bearings while equipment is in operation. Inspections at high-load locations are often performed during commissioning to reduce the risk of breakdowns during production shifts.

Mechanical vibrations need to be monitored right from the commissioning phase

Drive units such as motors, pumps, and gearboxes can develop mechanical misalignments after prolonged periods of inactivity. Misalignment or imbalance often manifests as slight vibrations initially, but tends to increase as the production line reaches higher loads.

Measuring vibration during startup helps identify changes in operating conditions compared to pre-startup data. When vibration parameters are monitored early, the adjustment process is easier than after the production line has been operating continuously.

The measuring equipment needs to be quickly checked before being put into use

Electrical meters, temperature probes, and handheld test equipment can experience changes in accuracy after prolonged periods of disuse. Data discrepancies in the initial stages can easily lead to inaccurate assessments of operating conditions.

Comparison testing between devices or comparison with internal benchmarks is a common step in many factories before actual measurements. The electrical, temperature, and signal measurement equipment distributed by EMIN Vietnam is widely used as a quick test kit for starting production lines at the beginning of the year.

Power supply, control signals, operating temperature, mechanical condition, and accuracy of measuring equipment directly affect the stability of the production line. When these parameters are checked during the commissioning phase, the system will achieve stable operation faster and minimize errors in the first production batches of the year.

관련 뉴스

Distinguishing between ARI’s Hypot, HypotUltra, and HypotMax: Which device is right for your factory?
2026년 07월 13일 09시 48분 30초

Few people realize that the concept of the "Hipot Test"—or electrical safety testing—has long existed within the electrical equipment manufacturing industry. Driven by the growing need to verify the voltage withstand capabilities of conductors, motors, and electrical devices, the industry required a robust and virtually fail-safe method to detect insulation weaknesses before products reached the market.

What Is Resonant Frequency? Why Can a Single Frequency Range Damage the Entire Product?
2026년 07월 10일 15시 10분 46초

A device may operate stably for months, yet suffer cracks, broken solder joints, or snapped component leads after being transported. What surprises many engineers is that the vibration amplitude during transport is no greater than usual. The root cause lies in a specific frequency range where the product's structure absorbs energy most intensely, triggering resonance and causing continuous stress concentration at a single point.

Should Carton Packaging Undergo Vibration Testing or Drop Testing First?
2026년 07월 10일 10시 38분 40초

Một kiện hàng gần như không bao giờ bị rơi ngay khi vừa rời khỏi nhà máy. Quãng đường hàng trăm kilomet trên xe tải, container hay băng chuyền mới là giai đoạn diễn ra đầu tiên, nơi bao bì liên tục chịu rung lắc trong nhiều giờ. Chỉ sau đó mới đến những cú va chạm khi bốc xếp, giao nhận hoặc rơi ngoài ý muốn.

Distinguishing Between DFT and WFT in Coating Thickness Measurement
2026년 07월 09일 14시 40분 30초

Many projects encounter a situation where a freshly applied coating looks perfectly uniform and paint consumption matches the estimate, yet additional coating is required during inspection because the thickness is insufficient. This leads many to suspect measurement errors or equipment inaccuracy, whereas the actual cause is a confusion between WFT (Wet Film Thickness) and DFT (Dry Film Thickness)

혜택 소식 받아보기

대량 할인, 도매 가격 업데이트 및 신제품 소식을 이메일로 받아보세요.

구독하면 당사의 서비스 이용약관개인정보 처리방침에 동의하는 것으로 간주됩니다.

빠른 지원

인증된 전문가에게 직접 연결