5 things to know when setting up a production line at the beginning of the year.

2026年02月24日 11時07分43秒

After the Lunar New Year holiday, many factories typically spend a short period testing their production lines before resuming stable production.

Prolonged machine downtime can alter the operating state of the equipment, from power supply and temperature conditions to signal controllers. When the machine is restarted, small errors can easily appear during the load increase phase.

Checking the accuracy of the control center from the very first shifts helps limit the failure rate in the production chain and reduces the risk of unplanned machine downtime.

Check the quality of the power supply before increasing production load

The electrical load in the area often changes after long holidays, leading to voltage fluctuations or the appearance of harmonics during certain operating hours. These fluctuations can directly affect inverters, PLCs, and automatic control systems when the production line starts running continuously.

Recording power quality data during commissioning helps identify power supply anomalies early. Models like the Chauvin Arnoux CA8336 allow monitoring of voltage, load current, harmonics, and voltage drops over actual operating cycles. Data collected in the first few hours is usually sufficient to assess stability before the line reaches its design capacity.

Control signal errors are more likely to occur after a period of machine downtime

Optical sensors, encoders, and analog signals in the 4 to 20 mA range can vary slightly due to environmental influences or mechanical conditions. Small deviations can still lead to recurring errors if the production line operates continuously for extended periods.

Direct observation of the signal waveform helps confirm that the amplitude and frequency are within operating limits. The Tektronix TBS2000B or Keysight DSOX1204G are popular models for quick signal testing in control cabinets and automated machinery.

Operating temperature changes when the production line resumes operation

Dust and moisture buildup during downtime can alter electrical contact and heat dissipation. As load current increases with production, some connection points begin to generate localized heat.

Thermal cameras help quickly identify areas of abnormal temperature on electrical cabinets, busbars, or motor bearings while equipment is in operation. Inspections at high-load locations are often performed during commissioning to reduce the risk of breakdowns during production shifts.

Mechanical vibrations need to be monitored right from the commissioning phase

Drive units such as motors, pumps, and gearboxes can develop mechanical misalignments after prolonged periods of inactivity. Misalignment or imbalance often manifests as slight vibrations initially, but tends to increase as the production line reaches higher loads.

Measuring vibration during startup helps identify changes in operating conditions compared to pre-startup data. When vibration parameters are monitored early, the adjustment process is easier than after the production line has been operating continuously.

The measuring equipment needs to be quickly checked before being put into use

Electrical meters, temperature probes, and handheld test equipment can experience changes in accuracy after prolonged periods of disuse. Data discrepancies in the initial stages can easily lead to inaccurate assessments of operating conditions.

Comparison testing between devices or comparison with internal benchmarks is a common step in many factories before actual measurements. The electrical, temperature, and signal measurement equipment distributed by EMIN Vietnam is widely used as a quick test kit for starting production lines at the beginning of the year.

Power supply, control signals, operating temperature, mechanical condition, and accuracy of measuring equipment directly affect the stability of the production line. When these parameters are checked during the commissioning phase, the system will achieve stable operation faster and minimize errors in the first production batches of the year.

相关新闻

EMIN Becomes an Official Distributor of ZEISS in Vietnam Starting July 2026
2026年07月24日 15時35分27秒

Starting in July 2026, EMIN officially became an Authorized Distributor of ZEISS in Vietnam. With a history spanning more than 175 years, ZEISS is recognized as one of Germany's technology companies and a global pioneer in the fields of optics and optoelectronics. The company provides advanced solutions for industrial manufacturing, scientific research, healthcare, semiconductor production, and quality assurance.

How Does Fluke Help Factories Detect Hard-to-Spot Electrical Risks?
2026年07月24日 14時23分04秒

The more high-capacity machinery a factory houses and the more complex its power supply network becomes, the harder it is for routine checks such as voltage measurements or visual inspections of electrical cabinets to fully reflect the safety status.

Which products are tested using a -40°C to +150°C thermal shock chamber?
2026年07月22日 14時45分25秒

Automotive circuit boards, sensors, modules, and plastic components can all experience issues after repeated transitions between cold and hot environments. A thermal shock chamber operating from -40°C to +150°C enables the replication of these temperature fluctuations under controlled testing conditions.

Does thermal shock cause damage to electronic components?
2026年07月22日 10時40分49秒

An electronic component may operate stably under constant temperature conditions yet fail after repeated rapid transitions between hot and cold. The issue typically stems not from a specific temperature level, but rather from the rate of temperature change and the number of hot-cold cycles

The rigorous standards behind a multi-million-dollar MRI suite
2026年07月21日 14時54分01秒

An MRI system may be correctly installed and fully connected to the power supply, yet still encounter issues if the surrounding environment fails to meet technical specifications. Electromagnetic interference, RF shielding, power quality, grounding, temperature, humidity, and particulate levels are all factors that may require assessment, depending on the facility's design and the manufacturer's requirements.

获取优惠更新

获取专属批量折扣、批发价格更新和新产品通知,直接发送到您的邮箱。

订阅即表示您同意我们的服务条款隐私政策

快速支持

直接联系认证专家