Standardizing cleanrooms with GMP air-blowing chambers: Increasing efficiency, reducing production risks.

2025年12月08日 13時45分10秒

Pharmaceutical products specialized in electronics, food and medical equipment manufacturing increasingly tighten requirements on sterility and cross-contamination control. Airshower blocks meeting GMP (Good Manufacturing Practice) standards have become a must-have item in modern cleanroom systems.

The role of air chamber in GMP clean room system

The air chamber is an intermediate device located at the entrance of the clean room, with the task of removing dust, microorganisms and impurities on clothes, shoes, trolleys or materials before entering the production area. Thanks to the high-speed clean air flow combined with HEPA filter, the air in the chamber is continuously cleaned and blown directly onto the surface to be cleaned at a speed of about 20-25 m/s.

More than just an auxiliary device, the air blower plays a key role in maintaining a stable cleanliness level, ensuring product quality and optimizing long-term operating performance.

Installing a standard air chamber will help businesses:

Legal compliance with meeting the mandatory requirements of regulatory agencies (e.g., Drug Administration, Ministry of Health) on GMP, ISO, HACCP standards.

Maximum pollution control, long-term stability of cleanliness level, reducing the load on the main air filtration system (AHU, HEPA box) inside the clean room.

Protect product quality and optimize production, prevent product damage due to contamination, thereby minimizing the rate of defective products, saving on recycling or disposal costs.

Therefore, installing a GMP-standard air chamber is a smart investment for the sustainable development of the business.

GMP standard air chamber installation process from A to Z

1. Site survey and installation location determination

The installation process of the air chamber requires high technical skills to ensure air tightness and optimal performance. And the first step in the air chamber installation process is to survey the actual construction area. The installation engineer will evaluate the direction of personnel movement, the clean room connection location, the installation space and the ability to supply electricity and gas.

The location of the air chamber must ensure one-way flow, avoiding reverse intersection causing reverse contamination. This is a key factor determining the efficiency of future operations.

2. Technical design suitable for cleanroom level

Depending on the cleanroom level (ISO 7, ISO 8, GMP C, GMP D…), the configuration of the air chamber will be considered and the design factors will be decided including:

+Number of air nozzles

+Air speed

+Fan capacity

+Type of HEPA filter

3. Construction of frame, shell and electrical control system

The air chamber is usually made of 304 stainless steel or powder coated steel, ensuring durability and corrosion resistance. When installing the air chamber, the interlocking door system, infrared sensor, control panel and power source must be connected absolutely precisely.

The interlocking system helps ensure that the two doors do not open at the same time, avoiding pressure loss and limiting dust from outside into the clean room.

4. Install the fan, filter and air duct system

The high-power centrifugal fan is responsible for creating a strong airflow, while the HEPA filter retains up to 99.97% of dust particles ≥ 0.3 microns. The entire system must be sealed to ensure no air leaks. Only when this step is up to standard will the air chamber truly perform its full potential.

5. Test run, calibration and acceptance

After completing the construction, the air chamber will be tested, measuring wind speed, air cleanliness, noise level and checking the operation of the interlocking door system. This is a mandatory step before putting the equipment into official use in the production line.

Tham khảo thêm tài liệu để hiểu rõ hơn về thí nghiệm thổi khí phòng thí nghiệm:

Kiến thức cần biết về thổi khí sạch vào phòng

Những lưu ý khi sử dụng Airshower- thổi khí mà bạn nên biết

So when does a business need to upgrade or install a new air chamber?

In fact, many air chamber installation systems do not achieve optimal efficiency because they ignore important technical factors. Learning from these common mistakes will help businesses ensure the quality of their clean room systems.

Enterprises should consider installing a new air chamber or upgrading when there is a change in production scale such as expanding the factory or production line. In addition, upgrading the clean room level according to new GMP standards also requires equipment to meet the corresponding standards. If the frequency of entry and exit increases, the risk of cross-contamination is high, or the old system operates poorly, and the dust filter is ineffective, it is time to take immediate action. Investing in installing an air chamber at the right time will help enterprises save a lot of costs in troubleshooting later and ensure continuous and effective production operations.

Optimal air chamber installation solution from EMIN

With many years of experience in implementing cleanroom projects, EMIN offers a complete air chamber installation solution from design consultation, construction, and acceptance, you can refer to: EMIN Air Shower

Not only providing equipment, EMIN also supports consulting on the correct GMP-level configuration, providing full equipment to measure wind speed, pressure, and dust for acceptance testing, maintenance, and periodic replacement of HEPA filters.

相关新闻

Checklist of 5 parameters to verify before sourcing plasma
2026年11月25日 10時25分45秒

Some ordering errors only come to light once the equipment arrives at the facility—such as a plasma power source failing to ignite, connectors that do not fit the electrical cabinet, or an inability to communicate with the existing PLC. Such issues often lead to weeks of waiting for replacements, causing production lines to come to a standstill. The following five categories of specifications can help engineers and procurement teams verify requirements before finalizing an order

DC, Pulsed DC, or RF: Selecting a Plasma Source Based on Material and Process
2026年11月23日 16時55分48秒

In sputtering, positive ions (typically Argon) are accelerated toward a target to bombard and dislodge material. A stable ion current can only be maintained if electric charge does not accumulate on the target surface. The simulation below illustrates this principle qualitatively: the blue trace follows the waveform, while the amber-colored bar represents the level of charge accumulated on the target surface

Errors in Measuring Rebar Diameter within Concrete
2026年11月23日 13時50分41秒

In the quality assessment of reinforced concrete structures using non-destructive testing (NDT) methods, determining the diameter (d) of reinforcing bars directly on a completed structural element often results in significantly greater margins of error compared to measuring the thickness of the concrete cover. If the identified diameter deviates by one or two standard size increments (for example, if a D16 bar is misidentified as a D20 or D12), the entire analysis—including the calculation of load-bearing capacity and the verification of the structural design—loses its reliability.

Assessment and Retrofitting of Reinforced Concrete Structures After Fire Exposure in Accordance with TCVN 14104:2025
2026年11月23日 11時48分42秒

In accordance with the principles for the preservation and post-fire structural assessment stipulated in TCVN 14104:2025, the inspection entity must accurately quantify the extent of cross-sectional degradation in heat-exposed concrete, the presence of subsurface delamination, and the condition of the internal steel reinforcement before developing a strengthening plan.

获取优惠更新

获取专属批量折扣、批发价格更新和新产品通知,直接发送到您的邮箱。

订阅即表示您同意我们的服务条款和隐私政策。

快速支持

直接联系认证专家