KYOCERA AVX SR211A102KAA 径向引线 SkyCap 100V 1000 pF C0G 10% 长引线 1"最小
ModelSR211A102KAA
联系我们
安全结算
品质保证
轻松更换与退货
支持配送
Width: 3.175 mm
Height: 5.08 mm
Length: 5.08 mm
Tolerance: 10 %
Case Style: Conformally Coated
Dielectric: C0G (NP0)
Capacitance: 1000 pF
Unit Weight: 218.380 mg
Lead Spacing: 5.08 mm
Lead Diameter: 0.508 mm
Voltage Rating: 100 V
Capacitance - nF: 1 nF
Capacitance - uF: 0.001 uF
Termination Style: Radial
Voltage Rating DC: 100 VDC
Operating Temperature Range: - 55 C to + 125 C
Maximum Operating Temperature: + 125 C
Minimum Operating Temperature: - 55 C
Temperature Coefficient / Code: C0G (NP0)
快速支持
直接联系认证专家

