For full functionality of this site it is necessary to enable JavaScript.
EMIN.VN
0

Live Webinar: Speed Up Your Production Test in Industrial 4.0

2020年08月20日 17時04分42秒

Many semiconductor and electronic device tests involve sourcing a voltage and measuring a current as quickly as possible.

Many semiconductor and electronic device tests involve sourcing a voltage and measuring a current as quickly as possible. Overall test time is a function of charge time, measure time, and discharge time, as well as the time to setup and process the test.

When a typical test program executes from a PC controller, it continually communicates back and forth with the test instrumentation. This communication time, whether it is over GPIB, LAN, USB, or some other protocol, is often one of the largest contributors to slower test times. Embedded test scripts minimize this communication time by storing and then executing entire test programs directly from the instrument’s non-volatile memory. All setup, decision-making, and data storage is now done from inside the instrument itself, independent of the PC.

Join us to learn about, what is a SMU and TSP. Experience the speed and power of the Keithley SMU and TSP, helping you in the new world of Industrial 4.0

  • DATE: 2/9/2020, Wed

  • TIME: 2:00 PM (GMT+8)

相关新闻

Leak Control NH3 in Industrial Cold Storage
2026年10月16日 16時35分37秒

Managing refrigeration systems using ammonia (NH3) aims to minimize the risk of poisoning, fires, and explosions, ensuring occupational safety and system operation

"Tektronix Semiconductor 2026" Seminar
2026年10月16日 14時35分31秒

EMIN, in collaboration with Tektronix at the National Innovation Center (NIC), cordially invites engineers, experts, and enterprises to attend an in-depth seminar on Semiconductor Technology & Physical AI.

Where Do Voltage Surges in Solar Power Plants Come From, and Why Do Clamp Meters Need the Appropriate CAT Rating?
2026年10月16日 11時10分43秒

The string of solar panels has been isolated, and the technician has completed the Lockout/Tagout (LOTO) procedure; he now stands before a combiner box, clamp meter in hand. A few hundred meters away, a bolt of lightning strikes an open patch of ground—missing the solar panels entirely. Yet, through the very conductor he is currently testing, a voltage surge of several thousand volts has just flashed by in less than a millisecond

获取优惠更新

获取专属批量折扣、批发价格更新和新产品通知,直接发送到您的邮箱。

订阅即表示您同意我们的服务条款和隐私政策。

快速支持

直接联系认证专家