For full functionality of this site it is necessary to enable JavaScript.
EMIN.VN
0
Product image

Microchip Technology 2N3763L 双极型晶体管 60V 1.5A 500mW 长引脚功率双极型晶体管 THT

联系我们
安全结算
品质保证
轻松更换与退货
支持配送

Technology: Si

Configuration: Single

Mounting Style: Through Hole

Transistor Polarity: PNP

Pd - Power Dissipation: 500 mW

DC Current Gain hFE Max: 80

Emitter- Base Voltage VEBO: 5 V

Collector- Base Voltage VCBO: 60 V

Continuous Collector Current: 1.5 A

Maximum DC Collector Current: 1.5 A

Maximum Operating Temperature: + 200 C

Minimum Operating Temperature: - 55 C

DC Collector/Base Gain hfe Min: 20

Collector- Emitter Voltage VCEO Max: 60 V

Collector-Emitter Saturation Voltage: 900 mV

获取优惠更新

获取专属批量折扣、批发价格更新和新产品通知,直接发送到您的邮箱。

订阅即表示您同意我们的服务条款和隐私政策。

快速支持

直接联系认证专家