For full functionality of this site it is necessary to enable JavaScript.
EMIN.VN
0

NOTICE REGARDING THE HUNG VUONG ANCESTOR COMMEMORATION DAY HOLIDAY & APRIL 30TH - MAY 1ST HOLIDAY

04/24/2026 17:06:41

Dear Customers, Partners, and Employees of EMIN Vietnam, we would like to announce the holiday schedule for Hung Kings' Commemoration Day, Liberation of Southern Vietnam Day (April 30th), and International Labor Day (May 1st) in 2026.

📢 ANNOUNCEMENT REGARDING HUNG VUONG ANCESTOR COMMEMORATION DAY & APRIL 30TH - MAY 1ST HOLIDAY

Dear Customers, Partners, and all EMIN Vietnam employees, we would like to announce the holiday schedule for Hung Vuong Ancestor Commemoration Day, Liberation Day (April 30th), and International Labor Day (May 1st) in 2026 as follows:

Hung Kings Commemoration Day Holiday:

⏰ Holiday Period: From April 25th, 2026 to April 27th, 2026

📆 Return to Work: Tuesday, April 28th, 2026

Southern Liberation Day (April 30th) and International Labor Day (May 1st) Holiday:

⏰ Holiday Period: From April 30th, 2026 to May 3rd, 2026

📆 Return to Work: Monday, May 4th, 2026

During the holidays, if you have any urgent issues requiring assistance, please contact us directly via our Hotline:

☎️ Hanoi City: (024) 35 381 269

☎️ Hai Phong City: 0968.515.900

☎️ Da Nang City: 0906. 492. 829

☎️ Bac Ninh Province: 0936. 415. 843

☎️ Dong Nai Province: 0932.160.940

☎️ Ho Chi Minh City: 0973.335.769

EMIN Vietnam wishes all customers, company employees, and their families a happy and joyful holiday.

Related News

Diffuse Reflective Fiber Optic Sensor Head
09/07/2026 15:17:17

Diffuse-reflective fiber-optic sensor probes solve automation challenges where machine space is too confined to install opposed-mode transmitter-receiver pairs. Both the emitter and receiver components are housed within a single probe, allowing it to scan one side of an object without requiring equipment to be placed on the opposite side

Reading Solar Irradiance and Inverter Power Output Charts
09/07/2026 14:16:25

A rooftop solar system might develop a problem as early as the morning, yet a technician might not discover it until the afternoon during an on-site roof inspection; meanwhile, monitoring software could have detected signs of an anomaly much earlier

Voltage Drop and Sudden Power Output Loss in Factory Rooftop Solar Systems: 4 Warning Signs Requiring Investigation
09/07/2026 11:02:08

When a factory equipped with a rooftop solar array experiences a sudden drop in power output, it often sparks a dispute between the facility's electrical team and the solar installation contractor, with each side prone to blaming the other. The quickest way to resolve such a conflict is to accurately interpret the signs on-site—avoiding guesswork and refraining from hastily blaming the solar panels.

Mastering Open-Circuit Voltage (Voc) and Short-Circuit Current (Isc) Testing for Solar Panels: An Engineer's Standard
09/07/2026 09:33:07

A solar panel reports a drop in output, yet the entire array continues to operate normally where does the fault lie? The answer often becomes apparent the moment a field engineer measures two fundamental parameters: open-circuit voltage (Voc) and short-circuit current (Isc). These two figures make it possible to isolate faults whether in the panel itself, the wiring, or the charge controller without needing to disconnect the entire string from the system. This article details the standard engineering measurement procedure and explains how to interpret the results, eliminating guesswork when troubleshooting panel issues.

Stay Updated with Offers

Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.

By subscribing, you agree to our Terms of Service and Privacy Policy.

Quick Support

Direct access to our certified experts